January 2003
|
|
OPCOM becomes full member of the Association of the European Power Exchanges - EuroPEX. |
February 2003
|
|
Sign up, with AREVA T&D (France), of the contract for the delivery of the IT system dedicated to the administration of the physical power market within the PHARE 2000 Programme, based on the financing provided by the European Commission through a grant. |
February 2003 The scope of the "Electricity Market Project" is outlined. |
|
First discussions between the representatives of IBRD, Kari Nyman, Amarquaye Armar and OPCOM.
|
May 2003 Washington DC, USA.
|
||
The Loan Agreement for the "Electricity Market Project" is signed. |
May 2003
|
|
Porto Roz, Slovenia. OPCOM participates to the VI Conference of the energy sector in Slovenia. |
June 2003
|
|
Bucharest. OPCOM organizes, in cooperation with the University of Ljubljana, Faculty of Electrical Engineering (Slovenia), the third edition of the Balkan Power Conference (BPC 2003), focused on the restructuring of the energy industry. |
July 2003
|
|
Lloyd's Register certifies the Quality Management System implemented by OPCOM according to the ISO 9001/2000 standard. |
October 2003
|
|
Saint Cyr-sur-Mer. OPCOM representatives participate to the EUROPEAN USER GROUP 2003 together with the users of the ALSTOM (further AREVA) systems | |
November 2003 Sign up, with Atos Origin (Spain), of the contract for technical assistance dedicated to the design and preparation for development of the financial power market, within the PHARE 2001 Programme, based on a grant provided by the European Commission.
|
ATOS ORIGIN experts within the EN 0107.10-01 project: Javier Mana Barrera, Raffael Villacastin Sierra, Enrique Rivero Azaola, Javier Martinez de Lejarza, Kasper Wallet (Maycroft Netherlands) |
November 2003
|
|
Slovenia. Joint delegation of ANRE, OPCOM visits Borzen. |